On Mar19-21,2014. The Thailand customer along with their engineer came to our factory inspect and supervise the delivery of their pulverized coal burner. This time they ordered two sets pulverized coal burner,model RM1500 andRM2000. After their inspect, they spoken highly of our quality and satisfy with our package.
At 25th, Feb. 2014, our HZS75 (75m3/h) concrete batching plant was shipped to Algeria from our factory.We will send engineers to guide the installation and train customers how to operate the whole concrete plant after the whole plant arrived at the customer’s site in Algeria.
From Feb20 to Feb23, related engineers from Thailand company project visited our factory again. This Thailand company is the top 500 company in the world, this time the related engineer come to study our asphalt mixing plant and pulverize coal burner.
Ukraine customer Mr. Sergey visited our company from 16th, Feb. to 19th, Feb. 2014.
At 14th, Feb. 2014, our 1.5m3/batch, JS1500 Twin-Shaft Concrete Mixer of 75m3/h concrete batching plant has completed producing. After assembly together with aggregate feeding system, weighing system, additive system, transmission system, control system and cement silo parts, the whole 75m3/h concrete batching plant will ship to Algeria at the end of this month.
January 23, 2014, in a campaign conducted by Chinese Journal of Construction Machinery & Traffic Construction Magazine, LYROAD is awarded "China Top Ten Brands of Asphalt Mixing Plant" title. After 22 years of continuous development, LYROAD has come to the forefront of the industry in technical innovation, marketing, service and globalization. Multi-faceted evaluation of media enables customers to a more intuitive understanding us.

